Design Build Finance Operate Maintain DBFOM
|
| The view north along U.S. Route 15 and east along Virginia State Route 7 (Leesburg Bypass) at the exit for Virginia State Route 267 EAST (Dulles Greenway, Dulles Airport, Washington) in Leesburg, Loudoun County, Virginia. |
Contents |
[edit] Introduction
Design build finance operate maintain (DBFOM) is a project delivery method that allows a private sector contractor to design, build and finance a project and then to handle operations and facilities maintenance under a long-term agreement.
NB Operations refer to actions taken to achieve business objectives. Maintenance refers to actions taken to keep the asset in running order. Maintenance can be considered a subset of operations, since it ensures that assets retain a good appearance and operate at optimum efficiency.
[edit] How DBFOM works
DBFOM is sometimes used by public sector entities for infrastructure projects such as bridges, roads, transportation facilities and so on. Public sector clients tend to use DBFOM for two purposes:
- To allocate risk for the project to the private sector contractor.
- To allocate responsibility for the project to a private sector contractor with expertise in areas that the client lacks.
By bundling the components of the project, the public sector client relinquishes responsibility without surrendering ownership.
Financial considerations may be the initial rationale behind the decision to use the DBFOM method, since it may open up access to private capital while conserving public resources and reducing debt potential.
This project delivery method delegates all project duties to the private sector party in exchange for fee payments collected over an agreed period of time. Operating control reverts back to the public sector client once the final payment has been made.
Payments may come in the form of availability payments or shadow tolls. Under an availability payment arrangement, the public sector client makes payments once the project is ready to use. Under a shadow toll arrangement, the public sector pays a predetermined amount to the private sector contractor for operating and maintaining the project. In the case of highways, bridges, tunnels and other roadworks that shadow toll fee is usually based on the number of vehicles that use the asset.
[edit] Applicability
The DBFOM method is used for both new construction and renovation of roads, bridges and tunnels which generate tolls from users. It is commonly used in the United States.
In the state of Virginia, the Dulles Greenway is a 14-mile shadow toll highway project that was privately financed and constructed between 1993 and 1995. The initial agreement reverts operational responsibilities back to the state in 2036.
To finance the Greenway, funding was obtained through loans that were to be repaid with toll revenues. However, a lack of traffic failed to generate the projected amount, so tolls - and legal speed limits - were increased on the road to entice drivers to use the highway. Revenue continued to miss targets, prompting the state to renegotiate a 20 year extension to the original agreement.
[edit] Related articles on Designing Buildings Wiki
- Availability payments.
- Design build finance and operate.
- Design, build, finance, maintain DBFM
- Design build operate maintain DBOM.
- Design construct manage finance DCMF.
- Government Construction Strategy.
- Infrastructure.
- Private Finance Initiative.
- Procurement route.
- Public Private Partnership.
- Shadow tolls.
- Statutory authorities.
Featured articles and news
ECA support for Gate Safe’s Safe School Gates Campaign.
Core construction skills explained
Preparing for a career in construction.
Retrofitting for resilience with the Leicester Resilience Hub
Community-serving facilities, enhanced as support and essential services for climate-related disruptions.
Some of the articles relating to water, here to browse. Any missing?
Recognisable Gothic characters, designed to dramatically spout water away from buildings.
A case study and a warning to would-be developers
Creating four dwellings... after half a century of doing this job, why, oh why, is it so difficult?
Reform of the fire engineering profession
Fire Engineers Advisory Panel: Authoritative Statement, reactions and next steps.
Restoration and renewal of the Palace of Westminster
A complex project of cultural significance from full decant to EMI, opportunities and a potential a way forward.
Apprenticeships and the responsibility we share
Perspectives from the CIOB President as National Apprentice Week comes to a close.
The first line of defence against rain, wind and snow.
Building Safety recap January, 2026
What we missed at the end of last year, and at the start of this...
National Apprenticeship Week 2026, 9-15 Feb
Shining a light on the positive impacts for businesses, their apprentices and the wider economy alike.
Applications and benefits of acoustic flooring
From commercial to retail.
From solid to sprung and ribbed to raised.
Strengthening industry collaboration in Hong Kong
Hong Kong Institute of Construction and The Chartered Institute of Building sign Memorandum of Understanding.
A detailed description from the experts at Cornish Lime.
IHBC planning for growth with corporate plan development
Grow with the Institute by volunteering and CP25 consultation.
Connecting ambition and action for designers and specifiers.
Electrical skills gap deepens as apprenticeship starts fall despite surging demand says ECA.
Built environment bodies deepen joint action on EDI
B.E.Inclusive initiative agree next phase of joint equity, diversity and inclusion (EDI) action plan.
Recognising culture as key to sustainable economic growth
Creative UK Provocation paper: Culture as Growth Infrastructure.